LIVE · 41 SOURCES
News Activity Log Weather Economy Municipal 🏙 Blindspot Divergence Owners 🏢 MPs 🏛 Cost of Parliament 💵 Markets 📈 Accountability Chain 🔗 Cross-Watch 🔗 Team Governance Methodology Score Education API Subscribe to What The Fact Sign in →
Le Devoir 📰 Le Devoir (independent co-op) 📍 QC Apr 29, 2026 · 4 min read Quick Score ○ Unverifiable View full audit trail → C.R.E.E.D. audited

Des moyens de pression d’un syndicat d’Hydro-Québec jugés illégaux

Original article ↗ 🔒 Paywalled source — limited preview available
B.I.A.S. ANALYSIS
CENTER
LEFTCENTERRIGHT
Signal breakdown
Heuristic (v1/v3) 0.00 · CENTER
ML v2 (DistilBERT) 0.307 · RIGHT
Ensemble 0.153 · CENTER
🏦 Source Intelligence
📰 Media · Le Devoir (independent co-op)
CA
Rolling outlet bias
CENTER
avg -0.131
4,102 articles tracked
7-day bias trend
LcenterR
🔒
V.E.R.I.F.Y. has fact-checked this article.
Subscribe to see claim-by-claim verdicts and reasoning.
Article Excerpt
ACCUEIL ÉCONOMIE Conflit de travail Des moyens de pression d’un syndicat d’Hydro-Québec jugés illégaux Le Tribunal administratif du travail épingle le SCFP pour des gestes posés la semaine dernière. Publié le 29 avril Photo: Christinne Muschi Archives La Presse canadienne Un travailleur d’Hydro-Québec marche sur le site de la sous-station Des Irlandais, à Montréal. LIA LÉVESQUE La Presse canadienne ARTICLE Pourquoi faire confiance au Devoir ? Le Tribunal administratif du travail vient de donner raison à Hydro-Québec, après avoir reçu une demande d’intervention urgente concernant des moyen…
Read full article at Le Devoir ↗
How we scored this article

WTF uses a two-tier system: every article gets a heuristic bias score from keyword analysis, and priority articles (high overlap across 3+ outlets or strong heuristic signal) get full LLM analysis from B.I.A.S. and V.E.R.I.F.Y.

Full audit trail for this article →