‘We don’t consent’: ProEnergy president questioned at meeting in Elsipogtog over power plant
Original article ↗B.I.A.S. ANALYSIS
CENTER
LEFTCENTERRIGHT
Signal breakdown
Heuristic (v1/v3)
0.00 · CENTER
ML v2 (DistilBERT)
0.329 · RIGHT
Ensemble
0.165 · CENTER
🏦 Source Intelligence
Rolling outlet bias
CENTER LEFT
avg -0.216
127 articles tracked
7-day bias trend
LcenterR
V.E.R.I.F.Y. has fact-checked this article.
Subscribe to see claim-by-claim verdicts and reasoning.
Subscribe to see claim-by-claim verdicts and reasoning.
Article Excerpt
The company behind a proposed gas-burning power plant in southeast New Brunswick faced heavy scrutiny on Wednesday night in Elsipogtog First Nation. Dozens of local residents attended the community meeting, many of them expressing strong opposition to ProEnergy’s proposed facility. ProEnergy Canada president John MacIsaac struggled to get through his presentation as community members peppered […]
Read full article at NB Media Co-op ↗
How we scored this article
WTF uses a two-tier system: every article gets a heuristic bias score from keyword analysis, and priority articles (high overlap across 3+ outlets or strong heuristic signal) get full LLM analysis from B.I.A.S. and V.E.R.I.F.Y.
Analyzed by
B.I.A.S.
V.E.R.I.F.Y.
L.O.C.A.L.
pending
May 26, 2026