NB Power wins regulatory approval for Tantramar gas/diesel plant despite harsh EUB rebuke
Original article ↗B.I.A.S. ANALYSIS
CENTER
LEFTCENTERRIGHT
Signal breakdown
Heuristic (v1/v3)
0.00 · CENTER
ML v2 (DistilBERT)
0.308 · RIGHT
Ensemble
0.154 · CENTER
🏦 Source Intelligence
Rolling outlet bias
CENTER LEFT
avg -0.207
69 articles tracked
7-day bias trend
LcenterR
Article Excerpt
The New Brunswick Energy & Utilities Board has approved NB Power’s plans for a 500 MW gas/diesel plant near Centre Village that would be built and operated by the U.S. company PROENERGY for 25 years. In an oral decision, Board Chair Christopher Stewart endorsed NB Power’s argument that it needs additional power by 2028 to […]
Read full article at NB Media Co-op ↗
How we scored this article
WTF uses a two-tier system: every article gets a heuristic bias score from keyword analysis, and priority articles (high overlap across 3+ outlets or strong heuristic signal) get full LLM analysis from B.I.A.S. and V.E.R.I.F.Y.
Analyzed by
B.I.A.S.
V.E.R.I.F.Y.
L.O.C.A.L.
pending
May 31, 2026