In New Brunswick, residents battle the government over a planned AI data centre
Original article ↗B.I.A.S. ANALYSIS
CENTER RIGHT
LEFTCENTERRIGHT
Signal breakdown
Heuristic (v1/v3)
0.65 · CENTER
ML v2 (DistilBERT)
0.284 · RIGHT
Ensemble
0.467 · CENTER RIGHT
🏦 Source Intelligence
Rolling outlet bias
CENTER LEFT
avg -0.215
125 articles tracked
7-day bias trend
LcenterR
V.E.R.I.F.Y. has fact-checked this article.
Subscribe to see claim-by-claim verdicts and reasoning.
Subscribe to see claim-by-claim verdicts and reasoning.
Article Excerpt
The proposed data centre in Lorneville, N.B., would raze wetlands and old-growth forest. Its on-site gas plant and additional demand on the power grid would make it one of the province’s largest emitters
Read full article at The Narwhal ↗
How we scored this article
WTF uses a two-tier system: every article gets a heuristic bias score from keyword analysis, and priority articles (high overlap across 3+ outlets or strong heuristic signal) get full LLM analysis from B.I.A.S. and V.E.R.I.F.Y.
Analyzed by
B.I.A.S.
V.E.R.I.F.Y.
L.O.C.A.L.
quick v1
Jun 4, 2026