Alberta’s Smith set to unveil details of proposed oil pipeline
Original article ↗B.I.A.S. ANALYSIS
RIGHT
LEFTCENTERRIGHT
Signal breakdown
Heuristic (v1/v3)
1.00 · RIGHT
ML v2 (DistilBERT)
0.347 · RIGHT
Ensemble
0.673 · RIGHT
🏦 Source Intelligence
Rolling outlet bias
CENTER
avg -0.016
3,237 articles tracked
7-day bias trend
LcenterR
Article Excerpt
The Alberta government is aiming for the pipeline to be designated a project of national interest by October and get shovels in the ground as early as September 2027.
Read full article at Global News ↗
How we scored this article
WTF uses a two-tier system: every article gets a heuristic bias score from keyword analysis, and priority articles (high overlap across 3+ outlets or strong heuristic signal) get full LLM analysis from B.I.A.S. and V.E.R.I.F.Y.
Analyzed by
B.I.A.S.
V.E.R.I.F.Y.
L.O.C.A.L.
pending
Jul 2, 2026